Sanitary Pump Station #2 is located at 1749 19th Ave. The project will include upgrades and replacement
of the current infrastructure located between Tamarac St. and Petersen Rd., along Highway 19A. The
design phase of the project will take place in 2023 and construction is targeted to begin in the
construction season of 2024.
Section of sanitary sewer that requires upgrades. (Ph.1)