Work under this project consists of the replacement of the storm and sanitary sewers along 6th Ave. and watermain upgrades along Thulin St. from 5th to 6th Ave. and along 6th Ave. from Alder St. to Island Highway. more...
This project involves replacement and upgrades to airfield lighting systems, taxiway “C” widening, apron 1 resurfacing and taxiway “B” resurfacing more...
The City of Campbell River is expanding improved services and infrastructure along Beech Street from Alder Street to 10th Avenue. more...
Under winter weather conditions, the sanitary sewer system in the Campbellton catchment area receives flows above its design capacity and requires upgrades to effectively handle these flows. more...
Work will include the installation of a temporary overflow pipe connected to the storm system served by the Robert Ostler Park outfall. These works are expected to provide some relief to the localized flooding being experienced on Shoppers Row between St. Ann’s and 10th Ave during extreme wet weather events. more...
Work under this project consists of utility, roadway and active transportation
improvements. The work is anticipated to take place along Erickson Road from Island Hwy. South to Nature Park Drive. Martin Road will also be included in the improvement work. more...
Work under this project includes upgrading the aeration digesters, Gen Set and related electrical system. more...
Work under this project consists of upgrading the 240m long walkway along the waterfront connecting Robert Ostler Park and the Government Wharf. more...
Work under this contract consists of the rehabilitation of existing sanitary sewer mains through the use of Cured In Place Pipe (CIPP) lining method. more...
Work under this contract consists of the rehabilitation of approximately 3500 lineal metres of existing sanitary sewer mains through the use of Cured In Place Pipe (CIPP) lining method. The work is to be delivered in segments as defined by man-hole to man-hole. more...
Work under this contract consists of the rehabilitation of approximately 5 km of existing sanitary sewer mains through the use of Cured In Place Pipe (CIPP) lining method. The work is to be delivered in segments as defined by man-hole to man-hole sections of relevant sewer main pipe. more...
The Campbell River Sportsplex is a pre-engineered, multi use facility located in the Willow Point area of Campbell River which includes racquetball and squash courts. more...
The project is in partnership between the City and the Vancouver Island Regional Library (VIRL) Board. It consists of building a new two-storey, 20,000 square foot library at the current location. more...
Work under this project consists of installing new watermains and domestic services at several locations within Campbell River. more...