6TH Ave. - Thulin Utility Renewal Project

Work under this project consists of the replacement of the storm and sanitary sewers along 6th Ave. and watermain upgrades along Thulin St. from 5th to 6th Ave.  and along 6th Ave. from Alder St. to Island Highway. more...

Airport Lighting, Visual Aids and Taxiway Rehabilitation 

This project involves replacement and upgrades to airfield lighting systems, taxiway “C” widening, apron 1 resurfacing and taxiway “B” resurfacing more...  

Beech Street Renewal

The City of Campbell River is expanding improved services and infrastructure along Beech Street from Alder Street to 10th Avenue. more... 

Campbellton Sewer System Upgrades

Under winter weather conditions, the sanitary sewer system in the Campbellton catchment area receives flows above its design capacity and requires upgrades to effectively handle these flows. more...

Downtown Storm Mitigation

Work will include the installation of a temporary overflow pipe connected to the storm system served by the Robert Ostler Park outfall. These works are expected to provide some relief to the localized flooding being experienced on Shoppers Row between St. Ann’s and 10th Ave during extreme wet weather events. more...

Erickson Road Utility Renewal and Improvement

Work under this project consists of utility, roadway and active transportation
improvements. The work is anticipated to take place along Erickson Road from Island Hwy. South to Nature Park Drive. Martin Road will also be included in the improvement work. more...

NWEC Upgrades - Phase 3

Work under this project includes upgrading the aeration digesters, Gen Set and related electrical system. more... 

Seagull Walkway Upgrade Project

Work under this project consists of upgrading the 240m long walkway along the waterfront connecting Robert Ostler Park and the Government Wharf. more...  

Sewermain Replacement Project 2021

Work under this contract consists of the rehabilitation of existing sanitary sewer mains through the use of Cured In Place Pipe (CIPP) lining method. more... 

Sewermain Replacement Project 2022

Work under this contract consists of the rehabilitation of approximately 3500 lineal metres of existing sanitary sewer mains through the use of Cured In Place Pipe (CIPP) lining method. The work is to be delivered in segments as defined by man-hole to man-hole. more...

Sewermain Replacement Project 2023

Work under this contract consists of the rehabilitation of approximately 5 km of existing sanitary sewer mains through the use of Cured In Place Pipe (CIPP) lining method. The work is to be delivered in segments as defined by man-hole to man-hole sections of relevant sewer main pipe. more...

Sportsplex Rehabilitation Project

The Campbell River Sportsplex is a pre-engineered, multi use facility located in the Willow Point area of Campbell River which includes racquetball and squash courts. more...

Vancouver Island Regional Library (VIRL) Site Preparation

The project is in partnership between the City and the Vancouver Island Regional Library (VIRL) Board. It consists of building a new two-storey, 20,000 square foot library at the current location. more...

Watermain Replacement Projects

Work under this project consists of installing new watermains and domestic services at several locations within Campbell River. more...

Featured
What's New
Jun 30, 2022 Canada Day 2022 Events
Jun 22, 2022 HOW’S THE WATER?
Jun 22, 2021 Summer Fire Safety
Feb 03, 2021 Calling young artists!
Jan 02, 2020 2019 Year-in-Review
Nov 01, 2018 New marine habitat
Nov 02, 2017 CRadvantage goes live!
Jul 25, 2017 Chalkfest returns!
Jun 30, 2017 Celebrate Canada Day!
Jan 09, 2017 2016 Year-in-Review
Dec 20, 2016 Tourism update!
Nov 16, 2016 Fire Chief for a Day
Oct 11, 2016 Afternoon garage fire
Sep 20, 2013 Walk-ability Survey
Sep 20, 2013 Tidemark grant in aid
Sep 21, 2013 ECAP
Sep 21, 2013 George Paul Passing
Sep 21, 2013 MyCity info update
Sep 21, 2013 Seed saving
Oct 08, 2013 Fire Prevention Week
Feb 24, 2014 Roads Update
Sep 24, 2014 Fall Fire Safety
Dec 18, 2014 Fawn Rd. house fire
Feb 06, 2015 Fire crews kept busy
Feb 26, 2015 Mobile home fire
Jun 26, 2015 New art summer camps
Dec 04, 2015 Storm Warning!
Jan 04, 2016 Jan. 1 City Currents
Jan 07, 2016 New Robron Field open!
Upcoming Events