6TH Ave. - Thulin Utility Renewal Project

Work under this project consists of the replacement of the storm and sanitary sewers along 6th Ave. and watermain upgrades along Thulin St. from 5th to 6th Ave.  and along 6th Ave. from Alder St. to Island Highway. more...

Airport Lighting, Visual Aids and Taxiway Rehabilitation 

This project involves replacement and upgrades to airfield lighting systems, taxiway “C” widening, apron 1 resurfacing and taxiway “B” resurfacing more...  

Campbellton Sewer System Upgrades

Under winter weather conditions, the sanitary sewer system in the Campbellton catchment area receives flows above its design capacity and requires upgrades to effectively handle these flows. more... 

CEDAR STREET SANITARY REPLACEMENT PROJECT

This project consists of replacing the sanitary sewer service at Cedar Elementary School, located at 261 Cedar Street. more...

Cheviot Road Pedestrian Improvements

The project is for the design and construction of a sidewalk and pedestrian crossings improvements along Cheviot Road. more...

Erickson Road Utility Renewal and Improvement

Work under this project consists of utility, roadway and active transportation
improvements. The work is anticipated to take place along Erickson Road from Island Hwy. South to Nature Park Drive. Martin Road will also be included in the improvement work. more...

John Hart Water Reservoir Project

This project is for the construction of a water reservoir and supporting infrastructure at the John Hart Water Centre site. more...

NWEC Upgrades - Phase 3

Work under this project includes upgrading the aeration digesters, Gen Set and related electrical system. more... 

Seagull Walkway Upgrade Project

Work under this project consists of upgrading the 240m long walkway along the waterfront connecting Robert Ostler Park and the Government Wharf. more...   

Sewermain Replacement Project 2023

Work under this contract consists of the rehabilitation of approximately 5 km of existing sanitary sewer mains through the use of Cured In Place Pipe (CIPP) lining method. The work is to be delivered in segments as defined by man-hole to man-hole sections of relevant sewer main pipe. more...

Sewermain Replacement Project 2024

Work under this contract consists of the rehabilitation of approximately 5.8 km of existing sanitary sewer mains through the use of Cured In Place Pipe (CIPP) lining method. The work is to be delivered in segments as defined by man-hole to man-hole sections of relevant sewer main pipe. more...

Sportsplex Rehabilitation Project

The Campbell River Sportsplex is a pre-engineered, multi use facility located in the Willow Point area of Campbell River which includes racquetball and squash courts. more...

Watermain Replacement Projects

Work under this project consists of installing new watermains and domestic services at several locations within Campbell River. more...